Aerial view of the Pratinha project

Iron ore

Pratinha

Pratinha / MG

Technical record

Substance
Iron ore
Municipality/State
Pratinha / MG
Cluster
Patrocínio, Araxá and Goiabal
Area
—
Phase
—
Logistics access
BR-262 + BR-354 · 303 km (Belo Horizonte)

About the project

Three contiguous tenements in the municipality of Pratinha, in the Alto Paranaíba region, around 300 km from Belo Horizonte, on ground of the Canastra and Ibiá groups. The target is iron ore.

The stage completed was the processing and interpretation of airborne geophysics from the CODEMIG survey, covering magnetometry and gamma-ray spectrometry. The work outlined nine magnetic bodies inside the tenements and estimated the depth of their sources. This is geophysical interpretation, not rock in hand: before any sizing come ground magnetometry, to close the outline of the anomalies, detailed mapping, to confirm the source rock, and sampling for chemical analysis.

From rock to final product

From rock to final product

  1. 01

    Iron ore

  2. 02

    Processing

  3. 03

    Steel

  4. 04

    Construction and industry

Location and logistics

Location and logistics

Pratinha / MG

Logistics

Road access
—
Rail terminal
—
Port
Tubarão, Açu e Sudeste do Brasil

Location shown at municipality level. Coordinates and mineral right polygons are not public information.

Licensing and compliance

  1. Exploration application

  2. Exploration permit

  3. Final Exploration Report filed

  4. Final Exploration Report approved

  5. Mining application

  6. Mining concession

Phases follow the authorisation and concession regime: exploration permit, Final Exploration Report (RFP) filed, RFP approved by ANM, mining application and mining concession.