Aerial view of the Malacacheta Grafita project

High-purity graphite

Malacacheta Grafita

Malacacheta / MG

Technical record

Substance
High-purity graphite
Municipality/State
Malacacheta / MG
Cluster
Malacacheta Graphite
Area
342.23 ha
Phase
Exploration permit
Logistics access
BR-381 + BR-120 + MG-217 · 450 km (Belo Horizonte)

About the project

The asset occurs in graphitic metasedimentary rocks of the Araçuaí Orogen, in a setting analogous to that of the mines already operating in the region. The tenements are consolidated in the portfolio, with graphite as the primary substance.

Preliminary geological reconnaissance has been carried out, and mapping and sampling are under way. What remains is to complete exploration and verify the lateral continuity of the bodies, calibrating the result against the Ibicaraí benchmark, which is the most advanced front.

From rock to final product

From rock to final product

  1. 01

    Graphite

  2. 02

    Processing

  3. 03

    Anode

  4. 04

    Lithium-ion battery

Location and logistics

Location and logistics

Malacacheta / MG

Logistics

Road access
Rail terminal
Port
Tubarão, Açu e Sudeste do Brasil

Location shown at municipality level. Coordinates and mineral right polygons are not public information.

Licensing and compliance

  1. Exploration application

  2. Exploration permit

  3. Final Exploration Report filed

  4. Final Exploration Report approved

  5. Mining application

  6. Mining concession

Phases follow the authorisation and concession regime: exploration permit, Final Exploration Report (RFP) filed, RFP approved by ANM, mining application and mining concession.

Want to go deeper into an asset?

The investor area brings together the portfolio by cluster, the stage of each project and its logistics access.